LuxuryDade tracks a published percent-sold figure for 15 South Florida luxury towers, and the spread is the whole story: Aria Reserve's South Tower passed 95 percent by April 2026 while the Residences at Mandarin Oriental's North Tower stood at 25 percent in October 2026. What I watch is pace, not level, because Arbor Residences in Coconut Grove climbed from 50 percent to past 80 in seventeen months. Ask any sales gallery for the figure in writing, with a date.

Every Miami sales gallery will tell you how sold out the building is. Almost none of them will tell you the date that number was measured, and nobody publishes the figures for a set of towers side by side. So a buyer comparing two projects is comparing one number that was true last week against another that was true last year.
This report is the LuxuryDade Sellout Tracker. It collects the published percent-sold figure for the 15 South Florida luxury condominium towers where an independent publication has reported one, and it prints the publisher and the month next to every row. Nothing here is estimated, averaged or modelled. If a tower is missing, it is because no dated published figure exists for it, and that absence is itself worth knowing.
- The Tracker: Percent Sold at 15 South Florida Towers
- What the Spread Says: 85 Percent Is the Hinge
- Sellout Velocity: The Arbor Curve
- Towers Past 85 Percent: What Is Left Is the Real Question
- Towers Under 50 Percent: Where Choice Still Exists
- Gerardo's Read: Five Questions to Ask About a Sellout Claim
- Methodology, Scope and What This Page Does Not Claim
- Frequently Asked Questions
The Tracker: Percent Sold at 15 South Florida Towers
Read this table by the last two columns first. A figure with no date is a slogan, and a figure with no publisher is a sales pitch. Every row below carries both.
| Tower | Area | Published sold figure | As of | Reported by |
|---|---|---|---|---|
| E11even Residences Miami | Park West, Downtown Miami | Sold out, 457 residences at about $375 million | June 2026 | The Real Deal |
| 7200 Collins | North Beach, Miami Beach | 96 percent, 213 of 222 homes | July 2026 | Florida YIMBY |
| Aria Reserve, South Tower | Edgewater | More than 95 percent | April 2026 | Florida YIMBY |
| Waldorf Astoria Residences Miami | Downtown Miami | More than 90 percent | December 2025 | Florida YIMBY |
| 2200 Brickell | Brickell | More than 85 percent at temporary certificate of occupancy | July 2026 | Florida YIMBY |
| Mr. C Hotel and Residences West Palm Beach | West Palm Beach | Past 85 percent | July 2026 | PROFILEmiami |
| Cipriani Residences Miami | Brickell | 85 percent | September 2026 | PROFILEmiami |
| Aria Reserve, North Tower | Edgewater | About 85 percent | April 2026 | Florida YIMBY |
| Arbor Residences Coconut Grove | Coconut Grove | Past 80 percent at certificate of occupancy | August 2026 | PROFILEmiami |
| Palma Miami Beach Residences | North Beach, Miami Beach | 75 percent | August 2026 | The Real Deal |
| 29 Indian Creek | Mid-Beach, Miami Beach | Past 70 percent | October 2026 | Florida YIMBY |
| 14 ROC | Downtown Miami | 50 percent | June 2026 | PROFILEmiami |
| Faena Residences Miami | Miami River | About 45 percent of 434 residences, at groundbreaking | November 2026 | Florida YIMBY |
| Colette Residences | South Brickell | 35 percent presold, before construction start | August 2026 | The Real Deal |
| Residences at Mandarin Oriental, North Tower | Brickell Key | 25 percent since the Signature Gallery opened | October 2026 | PROFILEmiami |
Eight of the 15 towers sit at or past 85 percent. One, E11even Residences Miami, is reported fully sold out, and it reached that at completion in June 2026 rather than at launch. The bottom of the set is the North Tower at the Residences at Mandarin Oriental, Miami, at 25 percent in October 2026, which is a normal reading for a tower that broke ground that same month.

What the Spread Says: 85 Percent Is the Hinge
The useful thing about putting these figures in one table is that the distribution is not smooth. The set clusters at two ends. Eight towers are at or past 85 percent, four are under 50 percent, and only three sit in the middle band between 50 and 85. Buildings do not spend long in the middle.
That shape matches what the construction milestones say. Of the eight towers at or past 85 percent, five had already reached a certificate of occupancy, a temporary certificate of occupancy or completion when the figure was reported. The low-percentage towers are the opposite: Faena Residences Miami was about 45 percent sold at its groundbreaking in November 2026, and Colette Residences was 35 percent presold with construction not yet started.
So percent sold is not really a measure of demand. It is a measure of how far along the building is. A tower at 35 percent before a shovel is in the ground and a tower at 90 percent at topping out can be selling at exactly the same rate.
A percent-sold number tells you where the building is in its life, not how good the deal is. The number I actually want is how many months it took to move the last ten points.
Gerardo Gonzalez, Licensed Real Estate Agent at Compass
Sellout Velocity: The Arbor Curve
One tower in this set has been reported three separate times by the same publication, which makes it the only clean velocity curve available. Arbor Residences in Coconut Grove is a 45-residence building by Ark Capital Group, and PROFILEmiami covered it at three stages.
| Reported | Published sold figure | Construction milestone | Source |
|---|---|---|---|
| March 2025 | 50 percent | Under construction | PROFILEmiami |
| March 2026 | Past 70 percent | Temporary certificate of occupancy | PROFILEmiami |
| August 2026 | Past 80 percent | Certificate of occupancy, move-ins underway | PROFILEmiami |
That is roughly 30 percentage points in 17 months, or about 13 homes on a 45-home building, and the pace barely changed across a temporary certificate of occupancy and a full certificate of occupancy. For a boutique project in an established neighborhood, that is the shape to expect: steady, not explosive.
It is one building, so it is an illustration and not a market rate. But it is the kind of reading that a single percentage never gives you, and it is the reason this tracker records dates rather than just numbers. If a second and third dated figure appear for any other tower here, they go into this section.

Towers Past 85 Percent: What Is Left Is the Real Question
Eight towers in this set are at or past 85 percent: E11even Residences Miami, 7200 Collins, both Aria Reserve towers, Waldorf Astoria Residences Miami, 2200 Brickell, Mr. C Hotel and Residences West Palm Beach, and Cipriani Residences Miami.
My advice on this band is simple, and it is the opposite of what the number makes people feel. Past about 85 percent you are no longer choosing a building, you are choosing from a list. The lines that sell first are the high floors with the long water view and the efficient two-bedroom layouts, so what survives to the last 15 percent is usually a low floor, an interior exposure, a corner that faces the garage ramp, or a penthouse priced in a different universe. Before you get excited that a tower is almost gone, ask for the availability list by line and floor and look at what is actually on it.
There is a pricing consequence too. Developers raise prices in tiers as a building sells, so the entry price at 90 percent is rarely the entry price that appeared in the launch coverage. Cipriani Residences Miami is the clearest example in this set: it launched from $1.1 million in March 2022 and the published entry price was $1.8 million by the July 2026 top-off, which is a different purchase at the same address.

Towers Under 50 Percent: Where Choice Still Exists
Four towers here are under 50 percent: 14 ROC at 50 percent in June 2026, Faena Residences Miami at about 45 percent in November 2026, Colette Residences at 35 percent presold in August 2026, and the Mandarin Oriental North Tower at 25 percent in October 2026.
None of those is a warning sign on its own, and three of the four were measured at or before groundbreaking. What they share is the thing the late-stage towers no longer have, which is a full floor plate to choose from. If you care about a specific line, a specific exposure or a specific floor, this is the band where you can have it, and you pay for that with time: your deposit sits with the developer for years rather than months.
The reading that should worry you is not a low number. It is a number that does not move. A tower reported at the same percentage across two reports a year apart is telling you something that no single figure ever will, which is why this page keeps the date on every row and keeps old readings when a new one arrives.

Gerardo's Read: Five Questions to Ask About a Sellout Claim
- When was it measured? A figure without a date cannot be compared with anything. Ask for the month, in writing.
- Who published it? A developer restating its own number is not independent. Ask whether PROFILEmiami, The Real Deal or Florida YIMBY has reported the same figure.
- Sold, or reserved? Reservations convert at well under 100 percent. Ask whether the figure counts signed purchase agreements with deposits.
- What is left? Ask for the availability list by line and floor. That is the only number that affects the home you would actually buy.
- What tier is the price in now? Ask for the launch price on your line and the current one. The gap tells you what the sellout already cost you.
If you want any of these answers on a specific tower, that is a phone call, not a web page. Remaining-inventory lists are not published anywhere and they change weekly.

Methodology, Scope and What This Page Does Not Claim
What is in the set. A tower enters this tracker when an independent publication has reported a percent-sold or sold-out figure for it and LuxuryDade carries a building page citing that report. That is 15 towers across Miami-Dade and Palm Beach counties as of November 14, 2026. It is not a census of South Florida pre-construction, and it is not a ranking of demand.
Where each figure comes from. Every row is copied from the linked report without adjustment, in the words that report used, which is why some rows read "more than 85 percent" and others read a flat number. Nothing is rounded, interpolated or converted into a unit count unless the source itself published one.
What this page does not claim. These figures are developer-reported and are not audited by anyone. They are not closed sales, they are not MLS data, and this report contains no multiple listing service content of any kind. A tower absent from the table is not unsold, it is unreported.
How to check any row. Open the tower name in the first column to read the LuxuryDade building page, which carries the same citation in context, then open the publication in the last column to read the original report. If a link no longer resolves, email the address below and it gets fixed or the row gets pulled.
Why this cut does not exist anywhere else. Each of these figures was published once, inside a story about a construction loan, a groundbreaking or a certificate of occupancy, and then left there. Putting them in one dated table is the work, and it is work nobody else is doing for South Florida.
Last verified November 14, 2026. Next scheduled refresh on or before February 14, 2027. This tracker is refreshed whenever a new dated figure is published for a tower already in the set, or when a new tower qualifies. If you are citing a figure from this page and the verification date above is more than 90 days old, email g.gonzalez@compass.com and I will confirm the current number before you publish.
Related Resources
- South Florida condo pipeline 2026: projects by stage
- Miami Condo Delivery Calendar 2026-2030
- Miami branded residences: the 2026 pipeline, brand by brand
- The Miami pre-construction buying process, step by step
- How to vet a Miami developer before you sign
- Miami pre-construction deposit schedule 2026
- South Florida Development Watch
- Every Miami luxury building we track